Home

NuWay GreenTech

  • Home
  • About Us
  • Contact Us
  • Services
  • Certifications
  • Key Projects

Site Map

  • Home
  • About Us
  • Contact Us
  • Services
    • Construction Solutions
    • Energy Conservation
    • Renewable Energy
    • Environmental Services
  • Certifications
  • Key Projects
    • Energy Conservation/HVAC
    • HVAC/Mechanical
    • Environmental Services

Key Projects

NuWay GreenTech Key Projects

Key Projects – Energy Conservation/HVAC

  • Energy Conservation hot water system study for the Naval Research Laboratory, Eastern Naval Command.
  • Replace Burner Eyes and Ash Hoppers, Boilers 1 thru 4, Bldg 1700 Marine Corps Base, Camp Lejeune. Part of the main Boiler Plant Retrofit to decrease Emissions (NOx etc.).
  • Replace Steam Turbine driven Condensate Feed Water Pumps and Ash Hoppers. Repair Boilers (Type D) Bldg. G650, Marine Corp Base, Camp Le Jeune.
  • Alterations to Burn Waste Oil – AS4151, Marine Corps Air Station, New River, Jacksonville, NC.
  • Atlantic City Municipal Utilities Authority, Install energy efficient HVAC equipment for the Laboratory and Maintenance Facility.
  • Phillips Alcohol Treatment Center using waste as an energy source with a backup boiler. The waste system connected to a pressure sewer, so a duplex-grinder pump was used. A full-service kitchen was also designed.
  • Mechanical room for the King Salmon UPH building containing a 100 to 15psig steam-pressure reducing station, condensate receiver and pumping unit, and steam-to-glycol convertor. Also designed the domestic hot water, plumbing and ventilation systems for this 20,000sq.ft. building.
  • Replacement of two 150hp steam boilers, condensate receive and pumps, converters and other appurtenances, piping, unit heaters, asbestos abatement and reinsulation..
  • Designed the radiant floor heating system for a 90,000sq.ft. hangar, mechanical room, all the steam and glycol-water piping and plumbing. Bldg 1140, Eielson AFB.
  • Repair Chlorinators and Filter, Bldg 3343, Eielson AFB.
  • Install Fuel Filters, JP4 fuel pump house, Eielson AFB.
  • Developed a sanitary air conditioning system for computer room cooling and ductwork.
  • Designed the Fort Greeley aircraft refueling facility, including pumping, filtration and controls, and piping.

Back to top arrow Back to Top

Key Projects – HVAC/Mechanical

  • Designed the boiler room for Colony Junior High School, a 100,000sq.ft. building. Load calculation, selection and layout of boilers, pumps, expansion tanks, combustion air, piping, fuel oil piping, gas piping and stack sizing.
  • Performed complete redesign of pool piping, filtration and pumping, and building ventilation system with packaged air-to-air heat recovery unit.
  • Install Ventilation System Building 1190, Eielson AFB.
  • Repair HVAC system Base Gym Bldg 3343 with new energy efficient systems.
  • Northern Lights Elementary School Expansion, Mechanical and Plumbing Systems.

Back to top arrow Back to Top

Key Projects – Environmental Remediation

  • Design/Build Chemsol Superfund Site, Inc., Piscataway, New Jersey, Groundwater Extraction treatment facility. Main process included Air Stripping, Catalytic Oxidation, Clarification, Fixed Film Aerobic System, Filtration and Sludge treatment and tertiary polishing with Granular Activated Carbon Columns.
  • Lucent Technologies Heleva Landfill, wastewater system design/build. Groundwater extraction600 GPM plant with Air Strippng Catalytic Oxidation, Carbon Polishing and discharge to Surface Water.
  • Prince Georges County Landfill Leachate Treatment Plant
  • Sullivan County Landfill Leachate Treatment Plant
  • Delaware Solid Waste Authority, Leachate Pretreatment Plant
  • Boeing Helicopters Center North, Ridley Township, Groundwater Extraction and Treatment System, Pennsylvania.
  • BASF Jamesburg, Design/Build of plant expansion.
  • Sony RGB process, San Diego, California. Design/Build inclusive of P & IDs and construction drawings, and construction management.
  • Hampton Township Wastewater Treatment Plant (WWTP) expansion frm an existing 1.6mgd facility to a 3.2mgd average and 10mgd peak.
  • Wastewater treatment facility for Rohm & Haas in Kentucky.
  • Designed a skid mounted mobile wastewater treatment system for a low temperature thermal treatment facility (LT3) for Weston Services, Inc., a WESTON Subsidiary. USATHAMA Supplemental Fuel Fired Boiler system to dispose waste.
  • Wastewater Neutralization Facility, E.R. Squibb and Sons, LTD. New Brunswick, NJ.

Back to top arrow Back to Top

NuWay GreenTech © 2010. All Rights Reserved. 4105 East Warren Avenue, Denver, CO 80222